Recommended Design
• Divide drainage system at natural high point
• Construct open trapezoidal concrete lined canal
• Pave 2nd half of 5th Ring with curbs
• Install box culvert at market area and Radial 17.5
• Pave market entrance area
• Install grated gutter to drain market area
• Install sidewalks
• Pave side street entrances with curbs
• Grade side roads
• Plant vegetation within project area